For block wall structures, create a 75mm deep aperture in wall, fix the AIW5 in place, tape the joint, then skim over the surface of the wall and the panel, or simply feather into existing plaster work using lightweight plaster mixes
Step 2:
Position installation lugs.
Step 3:
Fix installation lugs.
Step 5:
Fix Product in place.
Step 6:
Apply jointing tape.
Step 7:
For dry wall application, set panel back 1mm then fill joint and skim over surface of panel with joint compound.
Step 8:
Skim with plaster to blend with rest of wall.
Step 9:
Decorate with paint or wallpaper.